Tailings recovery operation near Kolwezi producing cobalt hydroxide and copper from historic deposits.
Sources support the description and the individual connections below. Publication and checking dates refer to the evidence, not a guarantee of current operations.
Reported means the cited source describes the relationship at its evidence date. Historical relationships refer to an earlier period. Announced agreements may not have been implemented. None of these labels confirms that trade continues today.
ERG and Electra explicitly identified Metalkol as the planned cobalt-hydroxide origin in their 2024 arrangement. The mine site did not sign this agreement; shipment is unconfirmed.
Cobalt will come from ERG’s Metalkol operation in the Democratic Republic of the Congo
The preliminary ERG–EVelution agreement named Metalkol as planned feedstock origin. This is a project-origin statement, not a direct mine contract or observed shipment.
ERG plans to supply cobalt hydroxide from its flagship Metalkol production facility in the DRC.
ERG describes Metalkol as its cobalt-copper tailings processing operation.
ERG’s Metalkol processes oxide cobalt/copper tailings to produce cobalt hydroxide
Dry-stacked at the dust-emitting Kingamyambo Tailings Dam (approximately 30 million tonnes)
Tenke Fungurume Mining (owned by CMOC); Metalkol (Eurasian Resources Group)